Back to AquaPakTM

AquaPak™ Booster System Worksheet

All fields in red are required

Job Name:
City, State:
Type of Building:
Your Name:
Title:
Company:
Address:
City/State/Zip
Phone:
Fax:
Designation: (BP-1, DWBP-1&-2, etc.)
Email:

 

Total System Demand1:

  GPM

Pressure Required Please enter data in PSI or Feet PSI Feet
Static lift (from pump discharge to highest fixture)
Pipe friction loss (including horizontal and fittings)
Loss through building fixtures and equipment2
Residual Pressure (at highest outlet)
Pressure drop through package

Total Required Pressure (A)

Pressure Available Please enter data in PSI or Feet PSI Feet
Minimum suction pressure available (at water meter)
Static loss (gain) from meter to pumps
Pipe friction loss
Loss through water meter
Loss through backflow preventer

Total Available Pressure (B)

Differential Pressure (Boost Required) - (A-B)

Voltage/Phase/HZ

 

Questionnaire:
1.  Maximum anticipated pressure at the water meter?

PSIG

2.  Where will the unit be installed?
     2a.  If OUTDOOR, describe environmental extremes3

     2b.  Will the unit require its own enclosure?

3.  Are periods of NO demand anticipated?

     3a. If Yes, approximate number no-flow hours per year:

Hours

     3b. What is the average cost per kW-h where installed?

  $

4. Are the owners / clients primarily interested in:
5. Are there any space limitations?  If yes, describe in No. 7
6. What piping material will be required?
7. Please list any special requirements for this installation:
NOTES:

1. Convert fixture units to GPM per local plumbing code.
2. Including pressure drop through water softeners, mixing valves, etc.
3. Temperature, wind, snow loads, etc.

Back to AquaPakTM